Case Studies

4799

Northumbrian Water - Overnight Penstock Installation

IQ Engineers were appointed to install new two Penstocks. Due to high daytime flows, the installation was required during the night to ensure safe access and minimal disruption. Read more

IMG-20260203-WA0008

Northumbrian Water - Penstock Removal and Installation

IQ Engineers were contracted by Northumbrian Water to remove existing penstocks, supply, and install a Weir Penstock. This upgrade formed part of the client’s ongoing improvements to their treatment process, aimed at enhancing long-term operational efficiency and reliability. Read more

IMG-20240718-WA0005~2

Wessex Water Distributor Replacement

IQ Engineers were contracted by our client to supply and install a 250mm Enclosed Filter Distributor. This project was part of our clients ongoing site upgrade to the filter bed treatment process to ensure long-term operational efficiency. Read more

Sluice gate installation site with operating gear and tripod hoist, managed by IQ Engineers.

Penstock Installation

IQ Engineers upgraded a surface water isolation system with bespoke stainless steel penstocks, ensuring Environment Agency compliance, minimal disruption, and long-term reliability. Read more

New valve repositioned in reservoir tower

An Awkward reservoir valve

Read more

Swan necked pipe

Runswick Bay SPS

Read more